1
Contact
our Team
You can contact IE Scaffolding by phone or email to discuss your scaffolding needs.
2
On-site Visit & Assessment
We will visit the site to assess it and determine the best scaffolding solution for you.
3
Rapid
Quotation
After the site visit, IE Scaffolding will provide you with a quotation for the work and advise you on any compliance and regulation requirements.
4
Scaffolding Supplied
IE Scaffolding will erect the scaffolding on your site as agreed. Ongoing inspection, Compliance, Design and Perimeter edge protection as standard.
Locations we cover
Based in Worksop, Nottinghamshire, but providing UK-wide National coverage.
We provide free consultations, quotations and advice on the best way forward with your scaffolding solution, we can advise if designs are required and arrange all the relevant permits if required.
We can also offer 24/7 callouts for emergency scaffolding requirements.
What we do
Get started today with our bespoke scaffolding solutions...
Fully Accredited & Insured
One-off project work
Reliable & Flexible Service
Latest UK standards - inc. to TG2021 guidelines
Scaffold tower hire
Ongoing scaffolding maintenance
Want to learn more about our scaffolding services?
Read our Frequently asked questions
- After installation and before first use.
- At weekly intervals until removed.
- At any point where circumstances arise that may compromise safety, e.g. extreme weather conditions.
We incorporate 6-8 weeks of hire, depending on the project. Anything thereafter is stated in the quote and with the hire charge. Essentially we're flexible and can advise you on any inspection requirements for longer-term hire.
Our team are able to work to all current regulations and standards. We're fully accredited and through our on-site visit and quote process can advise you on compliance and which regulations apply to your project.
Scaffolding design requirements
Scaffolding Design: Understanding requirements and compliance with TG2021 guidelines
TG2021 is a set of rules created by the National Access & Scaffolding Confederation (NASC) to make sure that everyone who uses tube and fitting scaffolding follows the same good practices. The aim of these rules is to provide a lot of different scaffolding structures that can be used without needing to design them from scratch.
The Work at Height Regulations 2005 states that if a scaffold is not assembled to a standard configuration, such as NASC Technical Guidance TG20 for tube and fitting scaffolds or similar guidance from manufacturers’ instructions for system scaffolds, then the scaffold must be designed by bespoke calculation and by a competent person. This means that the scaffold must be designed specifically for the job and by someone who knows what they are doing.
If your requirements fall within the basic compliance (TG-2021), then standardised design criteria compliance can be provided. This means that if your needs are simple and straightforward, then there are standard designs that can be used to meet your needs. These designs will meet certain requirements such as height and maximum dimensions, leg load, ties required etc.
If your chimney stack is not under basic compliance (TG-2021), then a structural designer will assess and ensure correct edge protection, support, facade supports - heavy-duty scaffolding. This means that if your chimney stack is more complicated than the standard designs, then a structural designer will look at what you need and make sure that the scaffolding is strong enough to support it.
Safety requirements for scaffolding
Health & safety: SG4 ‘Preventing falls in scaffolding operations’ safety guidance document
SG4 ‘Preventing falls in scaffolding operations’ is a safety guidance document that provides industry best practice for fall prevention when erecting tube & fitting and now also includes system scaffolding. The document provides guidance on how to erect, dismantle and alter scaffolding in a safe manner.
For scaffolds that fall outside the scope of a generally recognised standard configuration the design must be such that safe erection and dismantling techniques can also be employed throughout the duration of the works. Where this is the case, specific instructions may need to be provided with the design. Any proposed modification or alteration that takes a scaffold outside the scope of a generally recognised standard configuration must be designed by a competent person and proven by calculation


